14. Attach the tubehead plate in place by pressing it in one side at a time.
15. Install the head support to the lower shelf by screwing the rods in. Slide the head
support into the rods.
16. Remove all remaining protective film from the device covers and the patient
positioning panel.
ORTHOPANTOMOGRAPH
Reviewed Suuronen Esa 2019-09-19 12:21
Approved Lassinen Juuso 2019-10-02 14:37
PAN/3D device
™
OP 3D
9 Installation
CEPH device
D519207, 19
145