26.
Connect the vehicle speed sensor
(VSS),
the co
un-
tershaft speed sensor, and the
AfT
gear position
switch
connectors.
AIT GEAR POSITION
SWITCH CONNECTOR
COUNTERS HAFT
SPEED SENSOR
CONNECTOR
VEHICLE SPEED
SENSOR (VSSI
27
.
Connect the lock-up control solenoid
v
alve
connec-
tor, then install the
harness
clamp on the clamp
bracket.
RADIATOR HOSE
CLAMP
TRANSMISSION
GROUND CABLE
TERMINAL
HARNESS CLAMP
LOCK-UP CONTROL
SOLENOID VALVI'
CONNECTOR
6 x 1.0 mm
HANGeR
12 N·m 11.2 kgf·m,
8.7 Ibf.ftl
28. Install the transm ission
ground
cable terminal on
the t ransmi ssion
hanger.
and install the radiator
hose clamp on the transmission
hanger.
29. Connect the starter cables to
the
starter, and install
the harness clamp on the clamp bracket. Make sure
the crimped side of the starter cable ring terminal is
facing out.
HARNESS CLAMP
STARTER
CABLE
9 N·m (0.9
kgf·m,
7 Ibf.ftl
CLAMP BRACKET
30.
Inst
all t
h
e air cl eaner
hou
sing assembly and the
intake
air duct.
31
.
Refill the transmission with ATF (see page
14-16t).
32.
Connect the battery positive terminal and negative
terminal.
33. Set the parking brake. Start th
e engine,
and shift the
transmission through all gears three times.
34. Check the shift cable adjustment (see page 14-271).
35. Check the front wheel alignment and adjust it if
needed (see section
18).
36.
Let the engine reach normal operating temperature
(the radiator fan comes on) with
the
transmission in
~
or
(ffi
position,
then turn it off and check the A IF
level (see page
14-160).
37.
Perform a road test (see page
14·
157 and t4-158).