Honda CR-V 1997 Service Manual page 366

Table of Contents

Advertisement

Idle Control System
Power Steering Pressure (PSP) Switch Signal (cont'd)
'98 - 00 models:
Inspection of P$P
switch
signal.
Chaek for an open
In
the wire (PSP
SW~ne):
1.
Turn the
ignition
switch ON
(II).
2.
Measure voltage between
ECM/
PCM
connecto
r term inals A26
and 820.
"-
Is there less
than 1.0
V7
/ '
YES
Check the operation of the PSP
switch:
1.
Start
the engine
2.
Turn
steering wh eel to
the
full
lock
position*.
3.
Measure voltage
between ECM!
PCM connector terminals A26
and
820.
.......
Is there
battery voltage?
/ '
YES
psp switch signal is OK.
*:
Do
not hold the
steering
wheel at full
lock
for
more than
five
seconds.
11-164
Check for an open in the wire (PSP
SWline):
1.
Turn
the
ignition switch OFF
.
2.
Disconnect
the
psp
s
witch
2P
connector.
NO
3.
Turn the
ignition
switch ON
(II).
4.
At the wire side. connect the
PSP
switch 2P
connector
ter-
minals
NO.1
and
No.
2 with a
jumper wire
.
5.
Measure
voltage between
ECM/
PCM
connector
terminals A26
and 820.
Is
there less than
1.0
V?
YES
Replace the PSP switch.
NO
(To page '1
-'65)
ECM/PCM CONNECTORS
A 132P)
fsT6/L
/
1
"1:1
~
~
PSPSW IGRN)
B 125P)
--'-
-'
~J7l7IOl
C
~
-"- ."
~ ~
I
LGI IBRN/BLK)
Wire side of female terminals
PSP SWITCH 2P CONNECTOR ICI35)
PSPSWIGRN)
JUMPER
c:ffi
W1RE
2
GNDIBLK)
Wire side of female terminals
-
Repair open in the wire be·
twe.n the ECM/PCM (A26)
"-
NO
and th_ PSP
switch.
/ '
-
Repair open in
BlK
wire be-
tween the PSP switch and
G101.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-v 1998Cr-v 1999Cr-v 2000

Table of Contents

Save PDF