10 Operation

10-3 Test Run

When you finished installation, wiring, and switch settings, and confirmed that the status was normal
after turning ON the power supply, perform test run. The main purpose of test run is to confirm that the
servo system operation is electrically correct.
If an error occurs during test run, refer to
for safety, and retry test run.

10-3-1 Preparations for Test Run

Inspections Before Test Run
Check the following items.
 Wiring
• Make sure that there are no wiring errors (especially for the power supply input and motor output).
• Make sure that there are no short circuits. (Check the ground for short circuits as well.)
• Make sure that there are no loose connections.
• Make sure that the EtherCAT cable is pulled out.
 Power Supply and Voltage
• Make sure that the power voltage is within the specified range.
• Make sure that there is no voltage fluctuation.
 Servomotor Installation
• Make sure that the Servomotor is securely installed.
 Disconnection from Mechanical Systems
• If necessary, make sure that the load is disconnected from mechanical systems.
 Brake Released
• Make sure that the brake is released.
 Connection to Mechanical Systems
• Make sure that the load and Servomotor shaft are properly aligned.
• Make sure that the load on the Servomotor shaft is within specifications.
10 - 8
AC Servomotors/Servo Drives 1S-series with Built-in EtherCAT® Communications User's Manual (I586)
and eliminate the cause. Then check
Section 12 Troubleshooting

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R88m-1l seriesR88d-1sn ect seriesR88d-1sn01l-ectR88d-1sn02l-ectR88d-1sn04l-ectR88d-1sn01h-ect ... Show all

Table of Contents