Test Run

5-1

Test Run

Checklist
No.
1
Connection of power and I/O lines
2
Setting of DIP switches
3
Connection of R/W Head
4
Location of data carrier
5
Connection of host computer
6
Trigger condition
Procedure of Test Run
Power application
Checking of
external input
terminal functions
Off-line test in test
mode
On-line test by host
computer
Test run of system
End
Off-line Test in Test Mode
50
Item
Is the wiring correct? Are all terminals tightly secured?
Are communication specifications correctly set?
Is R/W Head correctly connected?
Are data carrier and R/W Head correctly located?
Is the RS-232C connector correctly connected?
Is the input condition of trigger correctly set?
– Check of supply voltage and power terminal connections.
– Check of supply voltage to input/output terminals.
– Check of ID Controller POWER indicators and R/W Head.
– Check of STOP operation by RESET input.
– Check of status of trigger input in I/O display mode.
– Check of communications between DC and ID Controller
without a host controller connection.
– Check of communications between host controller and ID
Controller by using test command.
– Check of overall system using actual commands and input/
output status.
By setting the Test Mode, communication between the ID Controller and DC can
be tested without the Controller being connected to the host computer.
Use this test to check mounting positions before the test run.
Section
Criteria
5-1