Download Print this page

Ferrari California Workshop Manual page 1308

Hide thumbs Also See for California:

Advertisement

Move the RHT electrically into the Coupé position, WITHOUT closing the hooks and ensuring that there
are no sounds of metallic contact.
Bring the RHT electrically into the Coupé position, completing the closing cycle.
Loosen the screw (14) fastening the eccentric
nut (2).
Adjust the eccentric nut (2) to move the skid
along the "X axis" by max 2 mm.
Holding the eccentric nut still (2), tighten the
screw (14).
Tightening torque
Screw
CAUTION
Danger of accident! At least two operators are
required to manually move the components of
the RHT roof, working slowly and in a
coordinated fashion.
Hold up the Rear Roof shell (1) and remove the
rod
(AV
8178) fitted previously.
Manually move the Rear Roof shell (1) towards
the front of the vehicle, bringing it over the
Front Roof shell.
Lift the headliner flap and check again that the
bracket (12) is inserted by approximately 2
mm into the rubber endstop (13).
If the components are still not within the
prescribed range, repeat the adjustment
procedure described above.
Nm
Class
8 Nm
B

Advertisement

loading