VC-SUMPT
Notes:
a. This port has been busied out with the busyout port UUCSSpp command.
b. The circuit pack has been removed or has been insane for more than
11 minutes. To clear the error, replace or reinsert the circuit pack.
c. The NPE Crosstalk test (#1103) failed.
d. The VC Summer Port Local TDM Loopback test (#1100) failed.
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below. For example,
by clearing error codes associated with the NPE Crosstalk test (#6), you may also
clear errors generated from other tests in the testing sequence.
Order of Investigation
NPE Crosstalk test (#6) (a)
TDM Loopback test (#1100)
1.
D = Destructive; ND = Nondestructive
555-233-142
Short Test
Long Test
Sequence
Sequence
X
X
X
Issue 1 May 2002
1
D/ND
D
D
8-1363