TIE-TRK (Analog Tie Trunk)
Table 8-497. Test #74 Tie Trunk EPF Test — Continued
Error
Test
Code
Result
Description / Recommendation
1040
ABORT
This test is not performed for trunk ports administered as access endpoints.
1. Verify this port is an access endpoint by using the display port command.
2. If the port has been administered as an access endpoint, then this test
2000
ABORT
Response to the test request was not received within the allowable time period.
2100
ABORT
Could not allocate the necessary system resources to run the test. This could
be due to a failure to seize the port.
1. Retry the command at 1-minute intervals up to 5 times.
1
FAIL
The E lead test failed due to an on-board port problem.
1. Replace the circuit pack.
2
FAIL
The M lead test failed. The EPF has experienced an overcurrent condition,
perhaps due to the external M lead.
1. To make sure the problem is on-board, disconnect the facility from the pack
2. If the test fails, replace the circuit pack. Otherwise, check the external
PASS
Tie Trunk EPF test is successful. This port is functioning properly.
1. If users are reporting troubles, examine loop connections to the port.
0
NO
The test could not relate the internal ID to the port (no board).
BOARD
1. Verify that the board's translations are correct. Translate the board, if
2. Issue the busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board command. This should re-establish the linkage
555-233-142
should abort.
and retry the test.
wiring toward the far-end PBX.
necessary.
between the internal ID and the port.