MODEM-PT (Modem Pool Port)
Table 8-348. Test #97 Modem Pool Conference Test — Continued
Error
Test
Code
Result
Description / Recommendation
4000
ABORT
System resources needed to complete the test could not be allocated.
Ordinarily, this means the conversion resource or other hardware used during
the test was in use.
1. Wait 1 minute and attempt the test again.
2. If the same error occurs, use the status port command to determine
3. If the conversion resource is in use, and it is absolutely necessary to test it,
4. If the same error occurs while the conversion resource is idle, busyout both
5. If the test continues to abort, replace the Pooled Modem circuit pack and
65515
ABORT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
2. Issue the test port long command on the port on which the test aborted. If
None
FAIL
The test failed. This error is internal to the Pooled Modem circuit pack and
does not involve external equipment or interfaces.
1. Busyout both of the TN758 Pooled Modem conversion resources on the
2. If the test continues to fail, replace the Pooled Modem circuit pack and
Any
FAIL
The Network Processing Element (NPE) of the tested port did not conference
the tones correctly. This will cause noisy and unreliable connections.
1. If the remaining ports are currently idle (amber LED is off), reset the circuit
2. If the test fails again, replace the circuit pack.
PASS
The port can correctly conference multiple connections. User-reported troubles
on this port should be investigated using other port tests and by examining
station, trunk, or external wiring.
555-233-142
whether the Modem Pool conversion resource is in use.
the call must be dropped by issuing a busyout port UUCSS command
against the conversion resource. Run the test again.
Modem Pool conversion resources on the TN758 Pooled Modem circuit
pack containing the conversion resource under test. Run the test again.
retest.
any test aborted or failed, follow recommended maintenance strategy for
the appropriate port type (for example, ANL-LINE, DIG-LINE).
circuit pack containing the failing conversion resource.
retest.
pack and repeat the test.