Subaru SVX 1992 Manual page 489

Hide thumbs Also See for SVX 1992:
Table of Contents

Advertisement

AUTOMATIC TRANSMISSION AND DIFFERENTIAL
Iw2C1) 3- 2
(7) Remove shift solenoids 1, 2, and 3, and duty
Tightening torque :
solenoid A.
8 N"m (0.8 kg-m, 5 .8 ft-Ib)
Solenoid ASSY
Solenoid-2 (shift)
Duty solenoid A
Solenoid-1 (shift)
(line pressure)
(J _
Solenoid-3
°
-a- °
°
(overrunning clutch)
o
-_
°
00
°
°
o
(
o
00
_
°
e
ca o
e
o °~
!
°
°
°
°
0 0
0
'
~O
°
~
0
°°
e
°° °
°
°
o °
°
°
°
B3-228
Fig. 95
2) Installation
(1) Install duty solenoid B (lock-up) .
Tighten bolts shown by solid arrows . The two bolts
and brackets shown b arrows " XX " must be ti k+ .
a. Secure accumulator springs using vaseline .
b. Align manual valve connections.
c . Tighten duty solenoid B (lock-up) bracket and two
bolts (also used to tighten valve body) .
o -
°
o
0
o
l
e _
O
G ~o
°
~\°
°1
C
o
0 ~
r , °
°
°
h
°
f
° °°°°°
-~~o °°°
Vaseline
B3-231
y
g
Fig. 98
ened later.
Duty sol . B (lock-up)
(4) Install oil strainer .
I I~° °'
'
l~`~rll~
Also install oil pipe and harness connector bracket.
Tightening torque :
7 - 9 Nom (0.7 - 0.9 kg-m, 5 .1 - 6.5 ft-Ib)
0
- ; ~- o
B3-229
Fig. 96
(2) Install solenoid valves .
Shift solenoids, 1, 2 and 3, and duty solenoid A (line
pressure).
Solenoid ASSY
Duty solenoid A
(line pressure)
o
-
O
°
00 0
°
°
r,
==`a Ilo
°
B3-230
Fig. 97
(3) Install valve body.
Solenoid-2 (shift)
Solenoid-1 (shift)
/Solenoid-3
(overrunning clutch)
°
0
°
115
(5) Connect harness connectors at 5 places .
Connect connectors of same color, and secure con-
nectors to valve body using clips.

Advertisement

Table of Contents
loading

Table of Contents