Subaru SVX 1992 Manual page 117

Hide thumbs Also See for SVX 1992:
Table of Contents

Advertisement

2-11 [w2B01
ENGINE AND TRANSMISSION MOUNTING SYSTEM
12) Connect power steering fluid hoses to gear box
17) Connect accelerator cable .
pipes .
18) Connect cruise control cable .
rig . ZY
13) Connect ATF cooler hoses to pipes on transmission
side .
Fig. 30
14) Install exhaust system .
(1) Install rear heat sealed cover.
(2) Install rear catalyst converter and front exhaust
pipes .
(3) Install Oz sensor harness to clip .
Refer to C.2-9 .
15) Install under cover.
16) Connect harness connectors .
After lowering the vehicle, connect the following con-
nectors .
Engine harness connector
Ignition coil connector
0 Vehicle speed sensor 2 connector
0 Oz sensor 1 If 2 (RH £r LH) connector
Power steering harness connector
Engine ground terminal
Alternator connector and terminal
* A/C compressor connector
Fig. 31
19) Connect pressure hose onto A/C compressor, and
charge with refrigerant .
(1) Connect high pressure and low pressure hoses
onto A/C compressor .
Low pressure hose /,
-
\
\
`r
High pressure hose J
-
/
C2-081
Fig. 32
Tightening torque : N "m (kg-m, ft-Ib)
18-31 (1 .8-3 .2, 13-23)
(2) Charge A/C system with refrigerant .
Refer to C.4-7 .
20) Install air intake system .
(1) Install air cleaner element and upper cover.
(2) Install air intake boot and collector cover.
(3) Install air cleaner element and upper cover .
21) Connect battery ground cable.
22) Fill with coolant.
Refer to C.1-5 Section 8.
23) Check ATF level, and correct if necessary.
Refer to C.1-5 Section 10 .
24) Correct power steering fluid, and bleed air.
Refer to C.4-2 .
25) Move damper, and close front hood .
26) Take off the vehicle from lift arms .
Refer to C.1-3.
14

Advertisement

Table of Contents
loading

Table of Contents