Renault Laguna III Manual page 2686

Table of Contents

Advertisement

Battery tray: Removal - Refitting
F4R or K4M or K9K or M4R or M9R
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
a Refit:
- the battery tray,
- the injection computer mounting bolt,
- the Protection and Switching Unit cover.
a Clip the earth wiring onto the battery tray.
II - FINAL OPERATION.
a Refit:
- the Protection and Switching Unit (see 87G, En-
gine compartment connection unit, Protection
and Switching Unit: Removal - Refitting, page
87G-2) ,
- the battery disconnection unit (see 80A, Battery,
Battery disconnection unit: Removal - Refitting,
page 80A-20) ,
- the battery (see 80A, Battery, Battery: Removal -
Refitting, page 80A-4) .
BATTERY
80A-28
80A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents