Octavia III 2013 ➤ , Octavia III 2014 ➤
1.8/132 kW TSI; 2.0/162 kW TSI engines - Edition 01.2015
Injection valve MPI- summary of components
1 - O-ring (when installing wet lightly with engine oil) - replace
2 - Injector
3 - Retaining clip
4 - O-ring (when installing wet lightly with engine oil) - replace
Install
– Replace O-rings for injection valve. Before installing, wet O-
rings with clean engine oil.
– Connect plug connections at the injection valves.
– Press fuel distributor with the injection valves into the bore in
the intake manifold by hand up to the stop (oil and grease free).
– Further installation occurs in reverse order.
– Install fuel distributor.
•
Tightening torque
⇒ "4.2 Fuel distributor MPI- summary of components",
page 299
4.6
Clean injection valves FSI
Special tools and workshop equipment required
♦ Ultrasonic cleaning device - VAS 6418-
♦ Feeder plate for injection units - VAS 6418/1-
♦ Cleaning fluid ⇒ ETKA - Electronic Catalogue of Original Parts
Note
The ultrasound device must be filled with cleaning agent up to
♦
the top of the holes (see inset).
Observe the safety and operating instructions of the ultra‐
♦
sound device.
Clean
– Remove injection valves
– Fill ultrasound device with cleaning fluid.
– Push FSI injection valves -1- into the feeder plate for injection
units - VAS 6418/1- -2- as far as they will go.
306
Rep. gr.24 - Mixture preparation - injection
⇒ page 300
.