Skoda Octavia III 2013 Workshop Manual page 31

Hide thumbs Also See for Octavia III 2013:
Table of Contents

Advertisement

– Expose the electrical wiring harnesses -1 and 2- on the air
guide pipe.
– Slacken screw clamp -4-.
– Unscrew the screws -arrows- and remove the air guide pipe.
Note
Do not pay attention to the position -3-.
– Release screws -arrows- and remove gearbox support brack‐
et.
– Fasten the gearbox to the lifting device - MP9-201 (2024 A)-
and to the workshop crane , e.g. -VAS 6100- , as shown in
the figure.
Note
For coordination with the unit centre of gravity position the perfo‐
rated rails of the suspension hooks must be placed as shown in
the illustration.
WARNING
There is a risk of accident from loose parts of the lifting device.
The suspension hooks and rig pin on the lifting must be se‐
cured using plug-in locks -arrows-.
Octavia III 2013 ➤ , Octavia III 2014 ➤
1.8/132 kW TSI; 2.0/162 kW TSI engines - Edition 01.2015
2. Removing and installing engine
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Octavia iii 2014

Table of Contents