Delta C2000 Series User Manual page 102

Classical field oriented control ac motor drive
Hide thumbs Also See for C2000 Series:
Table of Contents

Advertisement

Frame G
1.
On the conduit box, loosen 7 of the cover screws and remove the cover Screw torque: 24~26kg-cm
(20.8~22.6Ib-in) . On the drive, loosen 4 of the cover screws and press the tabs on each side of the cover to
remove the cover, as shown in the following figure. Screw torque: 12~15kg-cm (10.4~13Ib-in).
Remove the top cover and loosen the screws.
M5 Screw torque: 24~26kg-cm (20.8~22.6Ib-in)
M8 Screw torque: 100~120kg-cm (86.7~104.1Ib-in)
2.
Install the conduit box by fastening all the screws shown in the following figure.
M5 Screw torque: 24~26kg-cm (20.8~22.6Ib-in)
M8 Screw torque: 100~120kg-cm (86.7~104.1Ib-in)
Chapter 7 Optional Accessories C2000 Series
4
1
2
3
7-27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents