2 Installation and commissioning
2.5.2 Lifting robot with lifting slings
Continued
D
E
F
I
L
Required equipment
Equipment
Lifting device, robot
Slings attached directly onto robot
This section details how to lift and move the robot using lifting slings when these
are attached directly onto the robot frame.
1
2
3
4
5
6
82
Chain
M12 lifting eye
Lifting device´s eye
Lifting slings, 4 pcs
Hook
Art. no.
3HAC15607-1
Action
Run the overhead crane to a position above
the robot.
Position the robot as detailed in enclosed in-
struction!
Fit lifting device, robot to the robot as de-
scribed in enclosed instruction!
CAUTION
The IRB 7600 robot weighs 2500 kg.
All lifting accessories used must be sized ac-
cordingly!
WARNING
Personnel must not, under any circumstances,
be present under the suspended load!
Raise overhead crane to lift the robot.
© Copyright 2007-2013 ABB. All rights reserved.
Note
Includes:
user instructions (3HAC15971-2).
Note
Art. no. is specified in
ment on page
82.
Release the brakes if required as de-
tailed in section
Manually releasing the
brakes on page
85.
Art. no. is specified in
ment on page
82.
Make sure all hooks and attachments
maintain their correct positions while
lifting the robot!
Always move the robot at very low
speeds, making sure it does not tip.
3HAC022033-001 Revision: M
Required equip-
Required equip-