ABB IRB 7600 - 500/2.55 Product Manual page 290

Irb 7600 series
Hide thumbs Also See for IRB 7600 - 500/2.55:
Table of Contents

Advertisement

4 Repair
4.5.1 Replacing the SMB unit
Continued
Equipment, etc.
Circuit Diagram
Removing, SMB unit
Use this procedure to remove the SMB unit.
1
2
3
4
5
6
7
8
Refitting, SMB unit
Use this procedure to refit the SMB unit.
1
Continues on next page
290
Art. no.
-
Action
Move the robot to the calibration position.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working area.
xx0200000023
WARNING!
The unit is sensitive to ESD. Before handling the unit
please read the safety information in the section
WARNING - The unit is sensitive to ESD! on page 52
Remove the SMB cover by unscrewing its attachment
screws.
Remove the connectors X8, X9 and X10 from the
brake release board, if need of more space.
Remove the nuts and washers from the pins that se-
cure the board.
Gently disconnect the connectors from the SMB unit
when pulling the board out.
Disconnect the battery cable from the SMB unit.
Action
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working
area.
© Copyright 2007-2013 ABB. All rights reserved.
Note
See chapter
Circuit diagram on
page
457.
Note
Shown in the figure
SMB unit on page
289.
Shown in the figure
SMB unit on page
289.
Connectors R1.SMB1-3,
R1.SMB4-6 and R2.SMB
Shown in the figure
SMB unit on page
289.
Note
3HAC022033-001 Revision: M
Location of
Location of
Location of

Advertisement

Table of Contents
loading

Table of Contents