ABB IRB 7600 - 500/2.55 Product Manual page 319

Irb 7600 series
Hide thumbs Also See for IRB 7600 - 500/2.55:
Table of Contents

Advertisement

Required equipment
Equipment, etc.
Motor, axis 1
O-ring
Grease
Removal tool, motor
M12x
Lifting tool, motor ax
1, 4, 5
Extension 300mm for
bits 1/2"
Power supply
Standard toolkit
Calibration Pendulum
toolkit
Other tools and proced-
ures may be required.
See references to
these procedures in
the step-by-step in-
structions below.
Circuit Diagram
Removal, motor axis 1
The procedure below details how to remove motor, axis 1.
1
2
3HAC022033-001 Revision: M
Spare part no.
3HAC14207-1
21522012-430
Action
DANGER
Turn off all:
electric power supply to the robot
hydraulic pressure supply to the robot
air pressure supply to the robot
Before entering the robot working area.
Remove the cover for connector access on top of
the motor by unscrewing its four attachment screws.
© Copyright 2007-2013 ABB. All rights reserved.
4.6.1 Replacement of motor, axis 1
Art. no.
Note
Includes:
Must be replaced when
reassemling the motor.
3HAB3537-1
Used to lubricate the o-
ring.
3HAC14973-1
Always use the removal
tools in pairs!
3HAC14459-1
3HAC12342-1
-
24 VDC, max. 1,5 A
For releasing the brakes.
-
Content is defined in sec-
tion
Standard tools on
page
411.
3HAC15716-1
Complete kit that also in-
cludes operating manual.
These procedures include
references to the tools re-
quired.
See chapter
gram on page
Note
Continues on next page
4 Repair
Continued
motor
pinion
o-ring 21522012-
430.
Circuit dia-
457.
319

Advertisement

Table of Contents
loading

Table of Contents