ABB IRB 7600 - 500/2.55 Product Manual page 216

Irb 7600 series
Hide thumbs Also See for IRB 7600 - 500/2.55:
Table of Contents

Advertisement

3 Maintenance
3.4.8 Replacing the SMB battery
Continued
Battery pack with a 3-pole battery contact
xx1300000308
Required equipment
Equipment, etc.
Battery pack
Standard toolkit
Circuit diagram
Removing, battery
Use this procedure to remove the SMB battery.
1
Continues on next page
216
A
A Battery pack RMU
B Battery holder
Note
There are two variants of SMB units and batteries. One with 2-pole battery contact
and one with 3-pole battery contact. The variant with the 3-pole battery contact
has longer lifetime for the battery.
It is important that the SMB unit uses the correct battery. Make sure to order the
correct spare parts. Do not replace the battery contact!
Spare part no.
For spare part no.
see:
-
-
Action
Move the robot to its calibration position.
© Copyright 2007-2013 ABB. All rights reserved.
B
Note
Battery includes protection circuits. Only re-
place with a specified spare part or an ABB-
Spare part /
approved equivalent.
part list on
page 417
Content is defined in section
on page
See chapter
Standard tools
411.
Circuit diagram on page
Note
This is done in order to facilitate
updating of the revolution counter.
3HAC022033-001 Revision: M
457.

Advertisement

Table of Contents
loading

Table of Contents