(3) Speed change test
The appropriate speed and acceleration/deceleration time can be checked by changing speed or
acceleration/deceleration time or by performing override to the axis where the positioning start test, OPR test, or
JOG operation test is performed.
(a) Operating procedure
1.
Open the "Positioning Test" dialog box.
Display the "Positioning Test" window.
[Tool] [Intelligent Function Module Tool] [QD75/LD75 Positioning Module] [Positioning/Test]
Monitor current values such
as the current feed value and
feedrate.
Test each function while
checking current values with
the monitor.
2.
Select the test target axis.
Select the test target axis from the pull-down menu of "Target Axis".
760