Mitsubishi Electric MELSEC-L LD75P User Manual page 295

Positioning module
Hide thumbs Also See for MELSEC-L LD75P:
Table of Contents

Advertisement

(c) Machine OPR operation timing and process time
Positioning start signal
[Y10, Y11, Y12, Y13]
BUSY signal
[XC, XD, XE, XF]
Start complete signal
[X10, X11, X12, X13]
Md. 26
Axis operation status
Output pulse to external source
(PULSE)
Positioning operation
OPR request flag
[
Status: b3]
Md. 31
OPR complete flag
[
Status: b4]
Md. 31
[Normal timing time]
t1
0.2 to 1.1ms
• The t1 timing time could be delayed depending on the operating conditions of the other axis.
t1
Standby
OPR
t2
t2
0.4 to 1.3ms
CHAPTER 6 PROGRAM USED FOR POSITIONING CONTROL
t4
Standby
t3
t3
0 to 0.9ms
6
t4
0 to 0.9ms
293