ASSEMBLY
43. Pour approx. 2 liters (1-314 Imp qt) of A.T.F. into torque
converter.
44. Install torque converter to converter housing.
Be careful not to scratch front oil seal.
45. Apply sealant to threads of drain plug and install it in place.
46. Install inhibitor switch to transmission case.
47. Adjust inhibitor switch. Refer to On-vehicle Service.
48. Make sure that manual lever operates smoothly.