7) Push the 2 pressure levers simultaneously to secure the developing assembly.
NOTE :
Push both ends of the developing assembly pressure shaft until it fits into the groove.
8) Remove A3 paper that has been placed
on the drum.
9) Turn the lock lever in the direction of arrow
to release the lock of the process unit
upper cover.
10) Hold the grip to close the process unit
upper cover.
• 2 screws (use the screws removed
in step 1).)
9
Installation > Installation > Installing the developing assembly
9
Installation > Installation > Installing the developing assembly
F-9-55
x2
F-9-56
9-25
9-25