Chrysler 2005 Crossfire SRT6 Service Manual page 844

Table of Contents

Advertisement

8F - 32
CHARGING SYSTEM
ZH
INSTALLATION
1. Connect the generator B+ cable with the retaining nut and connect the generator harness connector (4). Tighten
the generator B+ cable retaining nut to 15 N·m (11 ft. lbs.).
2. Install the protective plastic cap on the generator B+ cable nut (5).
3. Install the generator (1) into the mounting bracket.
4. Install the upper and lower generator mounting bolts. Tighten the generator mounting bolts to 42 N·m (31 ft. lbs.).
CAUTION: Be sure to check proper installation on all pulleys.
5. Install the accessory drive belt. (Refer to 7 - COOLING/ACCESSORY DRIVE/DRIVE BELTS - INSTALLATION).
6. Install the right side air inlet tube.
7. Connect the negative battery cable.

Advertisement

Table of Contents
loading

Table of Contents