Chrysler 2005 Crossfire SRT6 Service Manual page 653

Table of Contents

Advertisement

ZH
TRANSMISSION 7 - 109
INSTALLATION
1. Position the cooler line(s) and loosely connect the fittings.
2. Install the retainers and bolts for the cooler line(s).
Note: Replace the copper washers if the banjo bolts are removed.
3. Tighten the cooler line fittings or banjo bolts to 20 N·m (15 ft. lbs.).
4. Tighten the transmission cooler line retaining bolts to 10 N·m (89 in. lbs.).
5. Lower the vehicle.
6. Install the radiator if removed. (Refer to 7 - COOLING/ENGINE/RADIATOR - INSTALLATION).
7. Check the transmission fluid level. (Refer to 21 - TRANSMISSION/TRANSAXLE/AUTOMATIC - NAG1/FLUID -
STANDARD PROCEDURE).

Advertisement

Table of Contents
loading

Table of Contents