Figure 8 Installing the Feed Roll and Feed Roll shaft.
5.
Observe following while installing Upper Feed Chute. (Figure 9)
•
Insert the Boss into the U-groove (A).
•
Insert the Tab into the Tab Slot (B).
•
Install the screw (1)
Repairs/Adjustments
REP 15.6.1
Figure 9 Installing the Feed Upper Chute
January 2007
4-146
Reversion 4.0
WorkCentre 7132