Xerox WorkCentre 7132 Service Documentation page 877

Service manual
Hide thumbs Also See for WorkCentre 7132:
Table of Contents

Advertisement

124-340 CRUM Market RAP
BSD-ON:16.1
There is a general CRUM control failure.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The
securely connected.
Y
N
Connect the connectors.
Turn on the power again. The problem persists.
Y
N
Return to Service Call Procedures.
Replace the ESS PWB (PL 11.2)
If the problem persists replace the MCU PWB (PL 11.1).
Status-indicator-raps
124-340, 124-341
124-341 CRUM Market MCU RAP
CRUM control failed on the MCU.
Procedure
Check the electrical connections on the ESS PWB and MCU PWB. The
securely connected.
connectors
are
Y
N
Connect the connectors.
Turn on the power again. The problem persists.
Y
N
Return to Service Call Procedures.
Perform GP 4, repair the problem by master SYS1.
If the problem persists, replace the MCU PWB (PL 11.1).
January 2007
2-844
connectors
are
Revision
WorkCentre 7132

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents