Xerox WorkCentre 7132 Service Documentation page 814

Service manual
Hide thumbs Also See for WorkCentre 7132:
Table of Contents

Advertisement

116-713 HDD Job Full RAP
The job output was split into batches when HDD capacity was reached.
Initial Actions
Power Off/On
Procedure
Ask customer to cancel and rerun the job.
Perform Hard Disk Diagnostic Program.
If the problem persists replace the HDD (PL 11.2).
Revision
WorkCentre 7132
116-714 HP-GL/2 Command RAP
There is a command error in the HP-GL/2 (Hewlett Packard printer control language)
Initial Actions
Power Off/On
Procedure
Ask customer to cancel and rerun the job.
If the problem persists check the electrical connections on the HDD (PL 11.2).
If the problem persists perform Hard Disk Diagnostic Program.
If the problem persists replace the HDD (PL 11.2).
January 2007
2-781
Status-indicator-raps
116-713, 116-714

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents