Xerox WorkCentre 7132 Service Documentation page 1160

Service manual
Hide thumbs Also See for WorkCentre 7132:
Table of Contents

Advertisement

8.
Remove the Support Bearing from the Main Paddle Shaft Assembly. (Figure 6)
(1)Remove E-Clip.
(2)Remove Support Bearing.
Figure 6 Removing the Support Bearing (j0fa42234)
Replacement
1.
Reverse the removal procedure for replacement.
Reversion 4.0
WorkCentre 7132
REP 22.5.5 Lower Chute Assembly
Parts List on PL 22.5
Removal
To avoid personal injury or shock, do not perform repair or adjustment with electrical
power applied to the machine.
Before turning OFF the power switch, note the following to prevent loss of customer data.
[with the FAX function]
Check that the "Job in Memory" lamp is off. Press the "Job Status" button and check that no job
is in progress.
[with the Printer function]
Check that "Ready to print/send" is displayed on the Control Panel.
1.
Remove the A-Finisher from the machine.
2.
Remove the Compile Assembly. (REP 22.9.1)
3.
Turn over the A-Finisher (Transport).
4.
Remove the Stapler Assembly. (Figure 1)
(1)Release Clamps (2) and remove the wire.
(2)Disconnect Connectors (2).
(3)Remove Screws (2).
(4)Remove Stapler Assembly.
Figure 1 Removing the Stapler Assembly (j0fa42219)
5.
Turn over the A-Finisher.
6.
Remove the Transport Motor. (Figure 2)
(1)Remove Screws (2).
January 2007
4-209
WARNING
CAUTION
Repairs/Adjustments
REP 22.5.4, REP 22.5.5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents