Xerox WorkCentre 7132 Service Documentation page 836

Service manual
Hide thumbs Also See for WorkCentre 7132:
Table of Contents

Advertisement

123-203 UI Controller RAP
The send request queue is full.
Initial Actions
Power Off/On
Procedure
Disconnect and reconnect the electrical connections on the UI PWB (PL 13.2) and P/J388 on
the ESS PWB (PL 11.2)
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists replace the UI PWB (PL 13.2).
If the problem persists replace the ESS PWB (PL 11.2)
Revision
WorkCentre 7132
123-207 Communication Manager Target RAP
A mailbox operations value is incorrect.
Initial Actions
Power Off/On
Procedure
Disconnect and reconnect the electrical connections on the UI PWB (PL 13.2) and P/J388 on
the ESS PWB (PL 11.2)
If the problem persists reload Software (ADJ 9.3.1).
If the problem persists replace the UI PWB (PL 13.2).
If the problem persists replace the ESS PWB (PL 11.2)
January 2007
2-803
Status-indicator-raps
123-203, 123-207

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents