Vanderbilt SPC4 Series Installation & Configuration Manual page 243

Table of Contents

Advertisement

SPC4xxx/5xxx/6xxx – Installation & Configuration Manual
Output
monitor
Primary
battery only
When expanders are added or removed go to Configuration > Hardware > X-BUS > Cable Map &
Configuration.
Click Reconfigure to implement changes.
When you click Proceed Reconfiguration, the whole X-BUS is reconfigured. If an expander is
offline and the reconfigure button is pressed, the expander will disappear without notifying the
user.
Reconfiguring the X-BUS
1. Select Configuration > Hardware > X-BUS > Cable Map & Configuration.
2. Click Reconfigure.
The X-Bus cable Map – Warning(s) page displays.
3. Click Proceed Reconfiguration.
The X-BUS is reconfigured.
If an expander is offline and the reconfigure button is pressed, the expander will disappear
without notifying the user.
See also
Wiring the system on page 75
Zone attributes on page 390
Zone types on page 385
Configuring an Indicator Expander
There are 2 possible configuration modes for the indication expander:
Linked Mode
l
Flexible Mode
l
© Vanderbilt 2018
Select which outputs are to be monitored.
Note: The parallel resistor, diode and required load must be applied before
enabling this option. The SPCP355.300 must perform a calibration before
monitoring starts. See Supervised Outputs on page 59 for more information.
Tick this box if there is no secondary battery connected to the PSU
243
Engineer programming via the browser
A6V10276959-d
12.09.2018

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents