Intake Manifold - Chevrolet CHEVY VAN G10 SERIES Service Manual

1972
Table of Contents

Advertisement

connect fro n t brake pipe at equalizer tee and connect
rear brake pipe at left fram e rail connector.
12.
Install cross shaft and connect clutch linkage and/or
transm ission linkage as outlined in Section 7.
13.
C onnect the following item s:
Fuel line (from tank) at fuel pum p.
Engine ground strap(s).
Steering idler arm at fram e.
Steering pitm an arm at steering gear—to rq u e n u t to
specifications.
Stabilizer shaft a t fram e brackets.
B attery positive cable at starter.
Shock absorbers at lower con tro l arm.
Speedom eter cable at transm ission.
TCS sw itch at transm ission— install TCS wire to clip
at transm ission/clutch housing.
E xhaust crossover a t m uffler and a t manifolds.
14.
Low er vehicle on hoist.
15.
C onnect
pow er brake vacuum hose at tube-to-hose
junction .
16.
C onnect E vaporation C ontrol System lines at rocker arm
cover and carburetor.
17.
C onnect TCS system electrical leads at valve an d at
tem perature sw itch— position harness in rocker arm cover
clips.
18.
Install D elcotron and supp ort assembly.
19.
C onnect accelerator linkage at dash m ounted bell crank.
20.
Install carb ureto r air cleaner and oil filler tu b e — connect
oil pressure gauge line if so equipped.
21.
C onnect engine wiring harness at dash panel ju n ctio n
block.
22.
Install radiator and fan shroud, connect rad iator and
heater hoses, install autom atic transm ission cooler lines
and fill cooling system .
23.
Install engine cover.
24.
C onnect b attery ground cable at engine block and at
b attery .
25.
Bleed fro n t and rear brakes as outlined in Section 5.
26.
S tart engine, check an d add engine coolant as required
and check engine for p roper operation.
Fig. 6 V —Supporting Power Train
INTAKE M A N IFO LD
Removal
1.
Drain radiator and remove air cleaner.
2.
D isconnect:
B attery cables at battery .
U pper radiator hose and heater hose a t m anifold.
A ccelerator linkage at pedal lever.
Fuel line at carburetor.
Crankcase ventilation lines (as required).
S park advance hose at distributor.
3.
Rem ove distributor cap and m ark ro to r position w ith
chalk, th e n remove distributor.
4.
Rem ove (as required) oil filler bracket, air cleaner
bracket, coil, accelerator retu rn spring and b racket, and
accelerator bellcrank.
5.
Remove m anifold attaching bolts, then remove m anifold
and carbu reto r as an assembly. Discard gaskets and seals.
6
. If m anifold is to be replaced, transfer:
C arburetor and carb uretor m ounting studs.
Oil pressure sending unit.
W ater o u tle t and th erm ostat (use new gasket).
Installation
1. Clean gasket and seal surfaces on m anifold, block, and
cylinder heads.
2.
Install m anifold seals on block and gaskets on cylinder
heads (Fig. 7V ). Use sealer at w ater passages and where
seals b u tt to gaskets.
3.
Install m anifold and to rqu e bolts to specifications in the
sequence o utlin ed on th e torq ue sequence chart.
GASKETS
FRONT SEAL
Fig. 7 V —Intake M anifo ld Gasket and Seal Location
ENG INE 6-29
C H E V Y V A N SHOP M A N U A L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents