Chevrolet CHEVY VAN G10 SERIES Service Manual page 326

1972
Table of Contents

Advertisement

RADIATOR SERVICE PROCEDURES
Removal (Figs. 1 and 2)
NOTE:
When draining the radiator use a short
piece of 3 /8 inch I.D. hose over the drain cock and
route hose past body parts to a clean container and
save anti-freeze for later refill.
1. Drain radiator and remove hoses and transmission lines if
equipped.
2. Remove finger guard (6 cylinder engine).
3. Remove upper retainers with fan shroud attached (V-8
engines) and rest fan shroud over engine fan.
4. Lift radiator out o f lower retainers.
Installation
Install in reverse order o f removal. Be sure lower and upper
retainers and mounting pads are properly positioned. Fill
cooling system and check for leaks.
GRILLE SERVICE PROCEDURES
Removal (Fig. 3)
1. Remove left and right headlamp bezels.
L -6 ENGINE
Fig. 1—R adiator Shrouds
SECTION 13
RADIATOR AND GRILLE
CONTENTS OF THIS SECTION
Radiator Service P r o c e d u r e s.....................................................13-1
Grille Service P r o c e d u r e s........................................................... 13-1
V - 8 ENGINE
Page
Fig. 2 —Radiator Mounting
2. Remove attaching screws. Grille to cross sill, body and
radiator support and remove the grille.
3. Separate emblem from grille,
nuts on rear o f emblem.
Installation
Install the grille in reverse order o f removal.
Fig. 3 —R adiator Grille
necessary, by removing
, f
CROSS
SILL
C H E V Y V A N SH O P M A N U A L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents