GENERAL INTRODUCTION/SAFETY INSTRUCTIONS AND READINESS TO WORK

INTRODUCTION TO WORKSHOP MANUAL

GENERAL

1.
SCOPE OF REPAIR DESCRIPTIONS
(1)
There are three major processes in repair work: i.e. "trouble shooting", "removal/installation, replacement, over-
haul, assembly, inspection and adjustment" and "final inspection".
(2)
This document covers only the first process (trouble shooting) and the second process (removal/installation,
replacement, overhaul, assembly, inspection and adjustment) and omits the third process (final inspection).
(3)
The element tasks listed below are omitted from this document but must be done in actual repair work.
a.
Jacking and lifting
b.
Cleaning and washing of removed parts as required
c.
Visual check
2.
STANDARD VALUE
(1)
Standard values, limits, required actions and tightening torques are tabulated in this document.
3.
REQUIRED ITEMS
(1)
Special tools, tools, instruments, oil and grease and other items to be prepared before starting work are listed in
the section titled "REQUIRED ITEMS". Note that general tools, jacks, rigid racks and other required items sup-
posedly available at a general service shop are omitted from the list.
4.
REPRESENTATION OF SECTION AND TITLE
(1)
Under a title containing a system name such as "ENGINE CONTROL SYSTEM", the descriptions cover
"INSPECTION", "ADJUSTMENT", "REPLACEMENT" and "OVERHAUL" of components.
(2)
Under a title containing a part name such as "AIR COMPRESSOR ASSEMBLY", the descriptions cover
"REPLACEMENT" and "OVERHAUL".
GENERAL INFORMATION
1–17
EN01H01ZZZ030102002001

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hino 195h seriesHino 155h seriesHino 195 series

Table of Contents