2–82
6
Check the resistance
ISGW
LES
TE2A
LF3
TE2B
CAL0
LF4
LEZ
CAL1
TE1A
CAH0
LF1
LEY
TE1B
LF2
CAL1
LF6
CAH1
LF5
CAH1
+B4
+B1
GND3
LER
LEN
LEV
+B3
GND5
GND2
LEQ
LEX
LEU
+B2
GND4
GND1
LEP
LEW
LET
Do the measurements meet the standard value?
Procedure completed.
CAN bus line (main line and trunk lines)
between terminating resistances is normal.
Go to the diagnostic procedure for the
detected DTC.
ENGINE (J05E)/TROUBLESHOOTING
1.
Connect the DCU (53P) connector and HV PCU connector.
2.
Use the electrical tester to measure the terminating resistance of
DCU (53P).
Starter key: ON
SHTS021270300065
YES
Measurement
Tester
conditions
connections
DCU (53P):
CAH1 – CAL1
Replace the DCU.
Refer to "DISCONNECTION INSPECTION
FOR ENGINE CAN_H COMMUNICATION L
LINE (500 k)" and check the CAN bus line.
Standard values
45 – 75
NO