2–334
3
Inspect the common rail pressure sensor unit
PCR1
VC1
E2
(main)
VC1
(sub)
E1
PCR1
(main)
VC1
(sub)
Do the measurements meet the standard value?
Go to step 4.
ENGINE (J05E)/TROUBLESHOOTING
1.
2.
PCR2
VC2
(main)
(main)
3.
PCR1
E1
(sub)
(sub)
E2
PCR2
VC2
(main)
(main)
PCR1
E1
(sub)
(sub)
SHTS021270300298
YES
Set the starter key to the "LOCK" position.
Disconnect the common rail pressure sensor connector.
Measure the resistance between the terminals of the sensor using
the electrical tester.
Measurement
conditions
connections
Common rail pres-
sure sensor
(1) VC1 (sub) –
Starter key: LOCK
PCR1 (sub)
(2) PCR1 (sub) –
E1 (sub)
Replace the common rail pressure sensor.
Perform "After-inspection work" of INFOR-
MATION section.
Tester
Standard values
(1) 1.05 – 3.55 k
(2) 6.7 – 18.7 k
NO