Resuming Operation - AgfaPhoto d-lab.2 8060/260 Operation Manual

Table of Contents

Advertisement

d-lab.2, d-lab.2plus, netlab.2plus: Operation
11.3

Resuming Operation

After the machine was shut down and out of operation for up to 2 weeks, the machine
must be put back in operation with the following routines:
After the machine was shut down and out of operation for more than 2 weeks, the
machine must be put back in operation with the following routines:
AgfaPhoto
Remove the dust cover.
If necessary fill water in the chemical tanks
to compensate for evaporated water and
wait for the machine to reach operating
temperature.
Turn the main breaker on.
Mix replenisher chemicals.
Check the chemicals, i.e. develop a chemical
Checking the Chemical
control strip (see
Process
in Chapter 5).
Adjust the replenishment rates (see
Processor Settings
in Chapter 4).
Proceed with the required maintenance
routines (see
Chapter 8
Remove the dust cover.
Proceed with the required maintenance
routines (see
Chapter 8
Mix the chemicals according to the
Operation Manual
instructions in the
Put the machine back in operation according
to the instructions in the
Operation Manual
of the
2005-05-01 / PN 04092_01
Machine Shutdown