d-lab.2, d-lab.2plus, netlab.2plus: Operation
6.1
Order Handling – Overview
6.1.1
Preparations Before Production Start
Prior to production start, the following routines must be completed:
Machine and user specific settings were made (see
–
Order configurations have been defined (see
–
Configurations
in Chapter 4).
Required maintenance is taken care of (see
–
Machine is switched on (see
–
Operator has logged in (see
–
Machine is calibrated (see
–
Order sorter is in working position.
–
AgfaPhoto
Chapter 4
Defining and Editing Order
Chapter 8
Switching On and Off
in Chapter 2).
Login of Another User
in Chapter 2).
Chapter 5
).
).
).
2005-05-01 / PN 04092_01
Production
6
6-1