Testing An Internal Emergency Stop; Flowcharts - HEIDENHAIN TNC 426 PB/M Technical Manual

Table of Contents

Advertisement

Testing an internal
EMERGENCY STOP
Connection
diagram

Flowcharts

6 – 174
For test purposes, an internal EMERGENCY STOP can be simulated in order
to inspect the correct wiring of the machine. The control-is-ready output is
reset. The NC and PLC are no longer operable.
Danger
Hanging axes must be supported before the test in order to prevent
damage to the machine in case of error.
7 7 7 7
Enter the code number FAILTEST under MOD.
In the event of an error, the control-is-ready output must trigger an emergency
stop. The control therefore checks this output every time that line power is
switched on.
Note
The circuitry recommended by HEIDENHAIN is illustrated in the Basic
Circuit Diagram.
Ensure that the control-is-ready acknowledgment occurs within 380 ms.
Flowchart for:
n
TNC 426 CB/PB
n
TNC 426 M/12 000 rpm (NC software < 280 476-06)
HEIDENHAIN Technical Manual TNC 426, TNC 430

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tnc 430 pa/mTnc 430 mTnc 426 cbTnc 430 caTnc 426 pbTnc 430 pa ... Show all

Table of Contents