6 – 200
Note
If after entry of a value in MP2391.x or MP2395.x the mechanics are
overloaded by the braking process, lower the value in MP2391.x or
MP2395.x until you have found an optimum between braking time and
mechanical loading.
MP2391
Maximum power for braking the first spindle in an
emergency stop
Input:
0.1 to 3000.000 [kW]
0: Braking power is not limited
MP2391.0
Wye connection
MP2391.1
Delta connection
MP2395
Maximum power for braking the first spindle in a power
failure
Input:
0.1 to 3000.000 [kW]
0: Braking power is not limited
MP2395.0
Wye connection
MP2395.1
Delta connection
HEIDENHAIN Technical Manual TNC 426, TNC 430