®
PARTNER
Advanced Communications System Installation, Programming, and Use
Installing the Cover
If you have a 5-slot carrier, it is important to install the cover to keep the modules dust-free and
properly seated, and the system working efficiently.
If you have a 5-slot carrier, install the cover by following these steps:
1. Position the carrier cover over the modules so that the openings on the top of the carrier cover
align correctly with the tabs at the top of the installed 5-slot carrier and modules.
2. Rotate the carrier cover into position so that it aligns correctly with the thumb screw opening
on the bottom of the carrier.
3. Tighten the thumb screw. To ensure proper alignment and safe operation, tighten the thumb
screw securely.
Installing Telephones
After you have installed the control unit and have connected the line and extension cords, you are
ready to install the telephones. Installing the telephones includes assembling, connecting, and
testing the telephone. As desired, you also can connect an Intercom Autodialer to certain
telephones.
Assembling PARTNER Telephones
All PARTNER telephones are shipped with a stand for either desk-mounting or wall-mounting the
telephone. For other telephones, see the instructions that are provided with the telephone.
Installing the Cover
2-34
2
2
2