Avaya PARTNER Installation And Use Manual page 372

Advanced communications system
Hide thumbs Also See for PARTNER:
Table of Contents

Advertisement

®
PARTNER
Advanced Communications System Installation, Programming, and Use
6. Before you insert the new module, make sure that all 400 (or 200) modules are installed to the
right of all 012E, 308EC, or 206 modules. If you have a T1 module or a 1600 DSL module, it
must be in the first slot on the left of the carrier (see
module to accommodate the new one, see
PARTNER ACS Release 7.0 supports Endeavor telephones when an Endeavor
362EC module is installed in the carrier. Install the Endeavor 362EC module(s) to the
right of the T1 module (if installed) or 1600 DSL module (if installed), and to the left of
any 400 and 200 module.
Figure 10-4. Placement of Modules
7. Push slowly but firmly in the center of the module until the module locks into place and is
attached to the rear of the carrier. Do not force the module. If the module does not insert
easily, remove it, clear any obstruction, and reinsert it.
8. Connect line and/or extension jack cords to the new module (see
Extensions" on page
9. Reconnect the power cord to the wall outlet.
CAUTION:
The power cord should hang straight down from the connector, flush against the plastic
case. Do not install the power cord at an angle to the case or with a loop in it.
10. Move the On/Off switch to the "On" position ("—").
Adding New Modules
10-8
"Replacing Modules" on page
PFT
L
I
N
E
S
PFT
E
X
T
E
N
S
I
O
N
S
2-16).
Figure
10-4). If you need to move a
10-10.
"Connecting Lines and

Advertisement

Table of Contents
loading

Table of Contents