Avaya PARTNER Installation And Use Manual page 368

Advanced communications system
Hide thumbs Also See for PARTNER:
Table of Contents

Advertisement

®
PARTNER
Advanced Communications System Installation, Programming, and Use
While the system upgrades, the LED on the processor module flashes green and red
alternately. When the upgrade has finished (in about 20 to 40 seconds), the LED becomes
steady green.
If the system has a T1 module, the module itself may take up to one minute to initialize.
If the system has a 1600 DSL module, the module itself may take from 2 to 7 minutes
to initialize.
6. Check that all green lights on the fronts of the modules are lit:
If a single light is out, power down the control unit, reseat the module and power up the
control unit.
If multiple lights are out, power down the control unit, reseat the leftmost module that has
a light out, and power up the control unit.
If the lights are still out, call for support as instructed on the inside front cover of this guide.
7. If you are upgrading PARTNER ACS R7.0, do not remove the PC card. The card automatically
converts to a backup/restore. If you removed other PC cards, PVM or ASA/DXD, for example,
power down the system and reinstall the PC cards after the upgrade is complete.
8. Perform one of the following steps:
If you have a 2-slot carrier or a stand-alone configuration, you are finished with this
procedure.
If you have a 5-slot carrier, continue with Step 9.
9. Make sure all modules are seated properly.
10. Position the carrier cover over the modules so that the openings on the top of the carrier cover
align correctly with the tabs at the top of the installed 5-slot carrier and modules.
11. Rotate the carrier cover into position so that it aligns correctly with the thumb screw opening
on the bottom of the carrier.
12. Tighten the thumb screw. To ensure proper alignment and safe operation, tighten the thumb
screw securely.
Using a PC Card
10-4

Advertisement

Table of Contents
loading

Table of Contents