Primary Power Supply Switch Installation - YASKAWA NX100 Instructions Manual

Hide thumbs Also See for NX100:
Table of Contents

Advertisement

4.2 Power Supply
4.2.4

Primary Power Supply Switch Installation

Install the primary power supply switch as shown.
NX100
Manipulator
HP3
HP6, EA1400N
HP20, EA1900N
UP20MN, UP50N
ES200N, HP165,
ES165N
ES165RN,
ES200RN
The maximum load value (payload, operation speed, and frequency, etc.) is displayed.
However, the power capacity is different depending on work conditions.
Inquire at the nearest branch office listed on the back cover for information when selecting the
transformer.
Breaker
Controller
for Positioner
Installation of the Primary Power Supply Switch
NX100 Power Capacity, Cable Sizes, and Switch Capacities
Power
capacity
(In case of Cabtyre cable (four wicks))mm
(kVA)
1
1.5
2.8
5
7.5
8.5
Breaker
Power
Source
Cable size (size of terminal)
3.5 (M5)
3.5 (M5)
3.5 (M5)
5.5 (M5)
5.5(M5)
5.5 (M5)
4-5
Breaker
Switch
capacity for
2
NX100
(A)
5
10
15
20
30
30

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents