10.2 Upgrade Procedure
3. Restart of the NPP01 Software (Upgrade Completed)
The NPP01 software is restarted when the upgrade of NPP01 software is completed
(in the same manner as power-on procedure). The following initial window appears
approx. 40 seconds later. (If the initial window is not displayed properly, turn ON the
main power again.)
If the power is turned OFF during the upgrade process of NPP01, a window to start
NOTE
upgrade operation reappears when restarting the NPP01 software. Perform the procedure
in " 10.2 Upgrade Procedure ".
JOB
FD/CF
DOUT
MOVE
CF
END
ARC WELDING
SETUP
VARIABLE
DISPLAY SETUP
B001
A a
IN/OUT
In
Out
ROBOT
SYSTEM INFO
=>
GETTOOL P000 TL#(0)
Main Menu
Short Cut
Turn on servo power
10-3