Step 2: Configure Test Set and UE Parameters
Set Uplink Channel Levels
As the example below illustrates, you can specify which closed loop power control bit sequence is sent on the
downlink DPCCH.
It is important for you to specify what uplink power level the test set should expect by setting the MS Target
Power. (In Active Cell mode, this command forces the UE to the specified output power. In FDD Test Mode,
since the 8960 is not performing active closed loop power control of the uplink, this command does not change
the UE's output power.) Setting the MS Target Power automatically sets the receiver's expected power
accordingly.
720
! Uplink Channel Levels
730
OUTPUT Testset;"CALL:CLPC:UPL:MODE ACT"
740
OUTPUT Testset;"CALL:MS:POW:TARG 0 DBM"
750
! Call Control
760
OUTPUT Testset;"CALL:PAG:IMSI '1234567890'"
770
OUTPUT Testset;"CALL:OPER:MODE CALL"
100
S:\Hp8960\E1963A WCDMA\4.0 release\Reference Guide\Chapters\wcdma_prog_getting_started_step2.fm