116-382 ABL Initialize RAP
HDD access by the ABL (Address Book Library) failed.
Initial Actions
Power Off/On
Procedure
Check the connection of each ESS PWB connector. The connectors are securely connected.
Y
N
Connect the connectors.
Switch on the power again. The problem persists.
Y
N
Return to Service Call Procedures.
Replace the ESS PWB
(PL
9.2)
If the problem persists perform
Hard Disk Diagnostic
If the problem persists replace the HDD
Status Indicator Raps
116-382, 116-385
Program.
(PL
9.2).
116-385 IDC Software RAP
An internal shutdown occurred after an IDC (scripting language) processing error.
Initial Actions
Power Off/On
Procedure
Reinstall or replace the DIMM
If the problem persists reload Software
If the problem persists, replace the ESS PWB
February, 2008
2-618
(PL
9.2).
(ADJ
9.3.1).
(PL
9.2).
WorkCentre 5225, 5230
Launch Version