NTP-B134 Create a Manually Routed VT Tunnel

DLP-B219 Provision a VT Tunnel Route

Purpose
Tools/Equipment
Prerequisite Procedures Perform this task as part of the
Required/As Needed
Onsite/Remote
Security Level
On the Circuit Creation wizard in the Route Review and Edit area, click the source node icon if it is not
Step 1
already selected. Arrows indicate the available spans for routing the tunnel from the source node.
Click the arrow of the span you want the VT tunnel to travel. The arrow turns white. In the Selected Span
Step 2
area, the From and To fields display the slot and port that will carry the tunnel. The source STS appears.
Figure 5-8
Figure 5-8
Step 3
If you want to change the source STS, change it in the Source STS field; otherwise, continue with the
next step.
Step 4
Click Add Span.The span is added to the Included Spans list and the span arrow turns blue.
Repeat Steps
Step 5
intermediary nodes.
Step 6
Return to the
Cisco ONS 15327 Procedure Guide, R4.0
5-34
This task provisions the route for a manually-routed VT tunnel.
None
Tunnel" procedure on page
As needed
Onsite or remote
Provisioning or higher
shows an example.
Manually Routing a VT Tunnel
3
and
4
until the tunnel is provisioned from the source to the destination node through all
"NTP-B134 Create a Manually Routed VT Tunnel" procedure on page
Chapter 5
Create Circuits and VT Tunnels
"NTP-B134 Create a Manually Routed VT
5-32.