Chapter 5
Create Circuits and VT Tunnels
If you selected Using Required Nodes/Spans in
Step 13
continue with
Click Next.
a.
In the Circuit Route Constraints area, click a node or span on the circuit map.
b.
Click Include to include the node or span in the circuit. Click Exclude to exclude the node or span
c.
from the circuit. The order in which you choose included nodes and spans determines the circuit
sequence. Click spans twice to change the circuit direction.
Repeat Step c for each node or span you wish to include or exclude.
d.
Review the circuit route. To change the circuit routing order, choose a node from the Required
e.
Nodes/Lines or Excluded Notes Links lists, then click the Up or Down buttons to change the circuit
routing order. Click Remove to remove a node or span.
Note
If you selected Review Route Before Creation, complete the following substeps; otherwise, continue
Step 14
with
Step
Click Next.
a.
Review the circuit route. To add or delete a circuit span, choose a node on the circuit route. Blue
b.
arrows show the circuit route. Green arrows indicate spans that you can add. Click a span arrowhead,
then click Include to include the span or Remove to remove the span.
If the provisioned circuit does not reflect the routing and configuration you want, click Back to
c.
verify and change circuit information. If the circuit needs to be routed to a different path, see the
"NTP-B185 Create a Manually Routed DS-3 Circuit" procedure on page
Click Finish. One of the following actions occurs based on the circuit properties you selected:
Step 15
If you entered more than 1 in the Number of Circuits field and selected Auto-ranged, CTC
automatically creates the number of circuits entered in the Number of Circuits field. If auto ranging
cannot complete all the circuits, for example, because sequential ports are unavailable at the source
or destination, a dialog box appears. Set the new source or destination for the remaining circuits,
then click Finish to continue auto ranging.
If you entered more than 1 in the Number of Circuits field and did not choose Auto-ranged, the
Circuit Creation dialog box appears for you to create the remaining circuits. Repeat Steps
each additional circuit.
After completing the circuit(s), CTC displays the Circuits window.
On the Circuits window, verify that the circuit(s) you just created appear in the circuits list.
Step 16
Step 17
Complete the
test circuit.
Stop. You have completed this procedure.
March 2003
Step
14:
If a node or span stays gray, that node or span is required.
15.
"NTP-B135 Test Electrical Circuits" procedure on page
NTP-B184 Create an Automatically Routed DS-3 Circuit
Step
9, complete the following substeps; otherwise,
5-37. Skip this step if you built a