Cisco ONS 15327 Procedure Manual page 32

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

NTP-B1 Unpack and Inspect the ONS 15327 Shelf Assembly
Test Equipment
In this chapter, the terms "ONS 15327" and "shelf assembly" are used interchangeably. In the
Note
installation context, these terms have the same meaning. Otherwise, shelf assembly refers to the physical
steel enclosure that holds cards and connects power, and ONS 15327 refers to the entire system, both
hardware and software.
NTP-B1 Unpack and Inspect the ONS 15327 Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Complete the
Step 2
Step 3
Continue with the
Stop. You have completed this procedure.
DLP-B1 Unpack and Verify the Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
When you receive the ONS 15327 system equipment at the installation site, open the top of the box. The
Cisco Systems logo designates the top of the box.
Step 2
Remove the foam inserts from the box. The box contains the ONS 15327 shelf (wrapped in plastic) and
a smaller box containing items needed for installation.
Cisco ONS 15327 Procedure Guide, R4.0
1-4
Volt meter
Power meter (for use with fiber optics only)
Bit Error Rate (BER) tester, DS-1 and DS-3
This procedure describes how to unpack the ONS 15327 and verify the
contents.
None
Required
Onsite
None
"DLP-B1 Unpack and Verify the Shelf Assembly" task on page
"DLP-B2 Inspect the Shelf Assembly" task on page
"NTP-B2 Install the Shelf Assembly" procedure on page
This task removes the shelf assembly from the package.
None
Required